Economic Development of Acuña, A.C.

[Imagen: Logo DEAC]

Welcome

Somos un grupo de empresarios locales, empeñados únicamente en contribuir a lograr la reactivación económica de la región, ajenos a cualquier interés político o particular.

Read more

Economic Development of Acuña, A.C.


Economic indicators

Foto imagen abstracta de economía

Manpower

Manpower of the Industry Assembly Plant
IndustryGeneral operator (Daily Wage)Qualifity operator (Daily Wage)Average Controls (Daily Wage)
Maquila $88.00 $104.00 $230.26

Tariffs of collection of electricity

Tariff 2 (less than 25 KW)
ConceptCost (pesos)
Fixed position 41.13
Additional charge: First 50 kWh 1.606
Additional charge: Following 50 kWh 1.938
Additional charge: kWh additional to the previous ones 2.137
   
Tariff 3 (more than 25 KW)
ConceptCost (pesos)
Monthly minimum 1,494.32
Charge by Maxima Demand 186.79
Additional charge (kWh) 1.176
Additional charge: kWh additional to the previous ones 2.137

© 2008 Desarrollo Económico de Ciudad Acuña, A.C.
Héroes de Nacozari No. 595, Col. Benito Juárez
C.P. 26215 | Cd. Acuña, Coahuila, México
MEX:01-800-831-7880 USA: 1-866-589-5111.

Visit Counter